From sketches to shovel: How The De Rimini fails
In the fall of 2009, an infill development on the west side of downtown Indianapolis caused a stir with local urbanists. The DiRimini, or as it was called early on, Sarajo Commons, was set to take an empty lot on N. Capitol Avenue. The project is targetting IUPUI students and potential downtown dwellers. Finally, someone was stepping up to fill in one of the many vacant lots on this side of town. The parcel in particular, was located along 733 N. Capitol Avenue, a former grassly lot that had sat vacant for years.

Sarajo Commons Initial Submission to MDC (Urban Indy has been unable to confirm if this was the final accepted plan)
When the initial plans were submitted to the Metropolitan Development Commission, the project looked like a win. Frontage to the street. Proper scale. Lots of windows and plenty of decoration to flesh out the buildings public faces. And located in the rear, would be parking. By all measures, a successful looking submission for this parcel. The massing is particularly strong for a small structure. 5 stories along Capitol Ave.
When work got underway last winter, Urban Indy’s own Chris Corr kept tabs on it over at his old blogsite. A couple posts of early construction can be seen here, and here.
Fast forward 7 months to present day and a casual observation of the new development will tell you immediately that something has went wrong. The project we have recieved only vaguely resembles what was submitted to the city last year. A comparison of the recent photographs to the submitted plans shows a lack of windows. 3 stories instead of 4 along St. Clair. A massing at the corner of St Clair and Capitol that wasn’t submitted into plan, and what appears to be a moving of the upper floor into a previously open area on the roof. And while the actual construction shows what appear to be painted on stripes across the faces, the submitted renderings show what appear to be outcroppings which serve to break up an otherwise flat face that we see today on site. The renderings show what appear to be shadows under these stripes which would seem to indicate some sort of protrustion. The lack of windows is likely the largest deviation I can see that has caused a vast change of vision.
How did this happen? How could a plan that started as a promising project get turned into something that is a ghost of what was planned? Others have apparently asked the same thing. Construction has skewed so far off plan, that a work stoppage order was issued on September 9th by the Department of Code Enforcement (RE: Case #VIO10-101658). The description for this case is as follows:
FAILURE TO COMPLY WITH REGIONAL CENTER PETITION 2009-REG-029 CONDITIONS # 1, 5, 7 AND 8 AND FAILURE TO COMPLY WITH IMPROVEMENT LOCATION PERMIT ILP09-01774
Currently, the City of Indianapolis is working with the developer’s attorney to mitigate these issues. Work has since resumed on the interior as well as some drainage infrastructure but exterior work is halted pending reinspection which, according to the city’s website, is on September 28th.
Urban Indy will continue to follow this issue as it hits close to the heart of many area urban advocates.
———————-
Updates on 10/6/2010 via the IBJ: What do you think? City seems to be hedging on “NO”